Our construction project is continuing with work now having started on the new Youth facility we’re building.  Site grading and demolition has begun and the Boy Scout hut will soon be moved to it’s new location back from where it currently sits.  There is a lot of grading and leveling to be done in addition to multiple de-watering installations that will be constructed into the site and building foundation.

The Sanctuary is nearing completion with the paint work almost finished.  The new carpet has been installed and the pew cushions will soon be returning.  The fire sprinkler system and new air handler for the Sanctuary air conditioning have been installed.

We’ve also installed a new voice evacuation system throughout the church so we can notify either all or selected parts of the church facility of any emergency that may be occurring.